WHY DOES THE WORK NEED TO BE DONE

Electrical Testing of all electrical circuits within The Faraday Student accommodation. Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.

HOW WILL THE WORKS AFFECT ME?

Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.  

TIMESCALE

29th July – 27th September 2024